This website uses cookies to store information on your computer. Some of these cookies are used for visitor analysis, others are essential to making our site function properly and improve the user experience. By using this site, you consent to the placement of these cookies. Click Accept to consent and dismiss this message or Deny to leave this website. Read our Privacy Statement for more.
Community Search
RFMA Gives
Blog Home All Blogs

Interior Work Has Started at The Daily Bread !!

Posted By Jeff Dover, CRFP, RFMA, Friday, May 19, 2017
Updated: Friday, May 19, 2017

Hello RFMA members,

Well, it was a battle but we finally received the building permit for the remaining work at the Daily Bread. There was a lot of behind the scenes support but a special thanks goes out to our architect, Scott Malenock, AIA, and one of the PM's, Ron Wilhite, CRFP. Work underway is as follows:

- Plumbing, new lines have been run in the foundation of the kitchen and several other plumbing jobs are currently being completed thanks to Roto-Rooter. Some supplies were generously donated by Florida Stainless.

- Electrical, new panels have been installed and several circuits have been ran in anticipation of the final kitchen remodel which is scheduled to start in mid to late June. Thanks to Facility Solutions for obtaining a local electrical contractor (Solaris) to complete. Also, special thanks to Stones River Electric for supplying almost all the materials along with Restaurant Lighting Concepts for the new exterior wall scone fixtures.

- A/C installations, new a/c units have been installed and the Daily Bread is much cooler. Some of these units haven't worked for years. Thanks to Performance Air for the installations and Trane and Johnson Controls for the equipment.

- Dining room ceiling, all the tiles have been replaced along with the light fixtures. Thanks to VMC Facilities for supplying and installing the tiles and lights and thanks to Stones River Electric, again, for supplying all new LED fixtures. It looks great and will save precious dollars on utilities.

- Demo work, thanks to Regions Facility Services, several areas of the kitchen and electrical room were demoed in anticipation of the electrical and plumbing work.

- Pest control, Amazing Pest Control provided their services to complete several treatments in vermin infested areas.

- Warehousing, thanks to National Distribution Service for providing needed storage space for equipment being, and soon to be used for the various projects.

- Special shout out to Pavement Exchange who was able to provide much needed funds to cover the cost of the masonry work throughout the building, which is scheduled to begin in mid-June. They, along with the following companies donated the money: Murphy Paving and Sealing, Atlantic Southern, Tibbs Paving, C&K Asphalt, Delaware Valley Paving, Alexander Sealcoating and Paving, Asphalt Solutions, AMERICOAT, and A&R Sealcoating.

- Dumpster, thanks to Waste Management for supplying a few construction dumpsters for the projects. 

- Lastly, big thanks to the Project Managers, Ron Wilhite, CRFP of Regions Facility Services and Mark Gomolla, CRFP of Red Robin Gorment Burgers. They have been tirelessly working on coordinating and completing these projects.

The Daily Bread employees have been great to work with and very patient with all the activities that have been happening. They continue to provide wonderful support to the local homeless community.

Stay tuned for more updates, thanks, and photos as the project progresses.

I'm truly sorry if I missed anyone or any company that has generously donated to these jobs.

Dover and out.


 Attached Thumbnails:

Tags:  Christian Service Center  Daily Bread  electrical  plumbing  RFMA Gives 

PermalinkComments (0)
 

RFMA Gives Update

Posted By Jeff Dover, CRFP, RFMA, Wednesday, December 21, 2016

Hello RFMA members,

Quick update on our project at the Daily Bread in Orlando. The main set of drawings have been completed and submitted to the city of Orlando for permitting. With a little support from Robert Stuart from the Daily Bread and Ron Wilhite, CRFP from Regions Facility Services, we are hoping to expedite the permitting process. Hopefully we will be able to get started in early January. Other items currently being permitted are the parking lot, roofing, and a/c installations. These projects should be well under way by the middle of January.

We have been fortunate to have several pieces of cooking equipment donated but are still in need of a couple electric tilt skillets. We also are needing a Florida registered electrician and plumber to complete several items in the facility. If interested, feel free to contact either myself at jeff@rfmaonline.com or one of our Project Managers at: ron.wilhite@rfsrenovates (Ron Wilhite), mgomolla@redrobin.com (Mark Gomolla) or kotto@redrobin.com (Kelly Otto).

Have a wonderful and safe Holiday Season!!

Stay tuned for more updates as the fun is just beginning.

Thanks for all who have donated!!

Tags:  charity  Daily Bread  donations  RFMA Gives 2017 

PermalinkComments (2)
 

Volunteer Day is Almost Here and Check Out the Latest RFMA Gives News Release

Posted By Jeff Dover, CRFP, RFMA, Wednesday, September 21, 2016

What You Need to Know Before RFMA Gives Volunteer Day

A huge thanks for participating in this year’s 2017 RFMA Gives Volunteer Day. We are going to have a lot of volunteers on Saturday and are excited about the huge impact our group will have on the Daily Bread and the local homeless community.

Below is some information you should “Know Before You Go” on Saturday!

-When: Volunteer Day begins promptly at 9:00 AM on the Daily Bread grounds. Please plan on showing up around 8:00 – 8:30 AM to check-in, get a shirt and gloves. Special thanks to Starbucks who will be supplying coffee and pastries for breakfast.

-Where: The Daily Bread is located at 808 West Central Blvd., Orlando, FL 32805.

Directions from the Marriott Courtyard Orlando Downtown:

Head north on N. Magnolia towards Zelma St. Turn right on Zelma St. then right again onto Irma Ave. Turn right at first cross street onto E. Colonial Dr. Turn left onto N. Parramore Ave then right onto W. Central Blvd. Proceed to front gate and you will be instructed where to park. There are a few lots nearby but street parking will be available.

-Shuttle Services: The Marriott Courtyard will be supplying a shuttle service from the hotel to Daily Bread beginning at 7:45 AM and run two (2) additional times at 8:00 & 8:15 AM. Please utilize the shuttle if possible as parking is limited.

-Work activities for Volunteer Day: Exterior/interior painting, several landscaping projects, reorganizing the Clothes Pantry, and general clean-up/reorganizing of several interior rooms in the Administration building. You’ll be able to choose any of these projects on site.

-Lunch: Special thanks to KFC and Olive Garden who will be serving lunch around noon.

-Weather: Thinking positively, we will have a sunny day and we’re in Orlando, so come prepared with a hat, sunscreen and bug spray.

-Volunteer Appreciation Event: The Volunteer Day is scheduled to end at 5:00 PM. There will be a Volunteer Appreciation event sponsored by Kinetico Commercial Water Systems at Citrus Restaurant. Please review your evite for further information and don’t forget to RSVP!

-Unable to make the Volunteer Event?
If your plans have changed and you are unable to attend, please contact Ryan Byrd (Nordling) at ryan@rfmaonline.com or 972-805-0905 ext. 5 to cancel your registration.

Thanks again for your support of RFMA Gives!

If you have any additional questions, please contact Jeff Dover, CRFP at jeff@rfmaonline.com

 

 

Tags:  Daily Bread  RFMA Gives 2017  RFMA Gives Volunteer Day 

PermalinkComments (0)
 

We Need Your Help!!

Posted By Jeff Dover, CRFP, RFMA, Tuesday, July 19, 2016

Hello RFMA members,

The majority of the projects have been assigned by our generous vendor members. Thanks to everyone that has offered up their services, equipment and time. We are getting closer to the finalizing the projects but there are still several outstanding items where help is needed. Please review the following list and let me know if you are interested in any of these projects:

-           Restroom remodels

-           Remodel dry storage room

-           Remodel/construct two (2) new offices

-           Supply/install new garage style, pull down exterior door

-           Remodel kitchen to include new soup area

-           Disposable plates, cups, spoons, paper goods, etc.

-           Folding style tables and chairs for interior dining room and exterior patio

-           Electrician to install new building panel

-           Sail type awning for new patio

-           Powder coat aluminum fencing

-           Replace carpeting in Administration building

-           Storefront glass window panels and frames

Again, thanks to all that will be donating. Following is an updated list of the projects and their respective donors.

-           Grease trap pumping, Primary – SLM Facility Solutions Nationwide. Secondary – Liquid Environmental Solutions

-           Pallet Jack – Classic Installs, Inc.

-           Equipment Repair Service, Whaley Food Service (labor) and Parts Town (parts)

-           Hood Cleaning, Rainbow International Restoration

-           Construction dumpster, Primary – RiverRoad Waste Solutions, Inc., Secondary – Westrock & Waste Management

-           New Smallwares – Franklin Machine Products

-           Shelving for kitchen/dry storage & walk in’s – VMC Facilities, LLC

-           Electrical Panel Upgrade – Stones River Electric/Square D (panel)

-           FOH flooring, strip & reseal VCT, replace black vinyl base – Superclean (installation), Red Lobster (materials)

-           BOH flooring – Silikal America

-           Upgrade interior FOH/BOH ceiling lights – Stones River Electric

-           Upgrade hood fire suppression system – Academy Fire Life Safety

-           Replace FOH/BOH ceiling tiles & grid – Sapphire Construction

-           Replace wooden pass thru with s/s – Florida Stainless

-           Provide/install FRP in BOH/cooking areas – Sheer Enterprises Inc.

-           Redesign kitchen & provide building remodel drawings – Ruby Tuesday, Inc. and Red Lobster

-           Replace storage tank water heater with tankless unit – Water Heater Man, Inc.

-           Relocate ice machine & remove upright 2 door cooler and freezer units – Caspers Service Company

-           Supply walk in cooler/freezer combination unit – Chipotle

-           Supply/install new mop sink - Facility Solutions

-           Supply refrigeration for new walk in cooler/freezer unit – Heatcraft Worldwide Refrigeration

-           Periodic pest control treatments – Amazing Pest Control

-           Install new concrete ramp for new garage entrance to building – Mad Jack’s Facilities Resource

-           Replace existing t-stats with EMS – Primary – Entouch Controls, Secondary – 75F, Ektos, LLC., and Powerhouse Dynamics

-           Supply/install new security/CCTV system – Tyco Integrated Security

-           Paint the exterior of the buildings – U.S. Exterior and Paint Folks

-           Supply paint for interior & exterior – Benjamin Moore and DMC Facility Services

-           Remove/dispose existing steel pipe queue rail at front entry – Fine Line Facility Services

-           Replace exterior wall sconces – Restaurant Lighting Concepts

-           Replace parking pole light heads – MX Services

-           Supply replacement a/c units – The Trane Company and Johnson Controls

-           Install new a/c units – Performance Air

-           Air Balance building – Melink Corporation

-           Replace the Daily Bread building roof – Royalty Roofing (installation) and Duro-Last Roofing, Inc. (material)

-           Supply new exterior signage – Primary – Sign Manager, Secondary – MC Sign

-           Replace four(4) exterior doors – Locknet

-           Repair/replace parking lot around Daily Bread building – Primary -  Mad Jack’s Facilities Resource. Secondary – Pavement Exchange

-           Paint parking stops – Fine Line Facility Services

-           Professional landscaping  - Dentco

-           Patio addition – Versico Roofing (pavers)

-           Install concrete bollards for patio awning system – Mad Jack’s Facilities Resource

-           Periodic a/c filter replacement – Bonded Filters

-           Periodic HVAC maintenance – AFM, Inc.

-           Equipment cleaning, power washing, janitorial – Hoodz International and Superclean

-           RFMA Gives video and pictures – DWM, Inc.

-           Food Safety Training – Lars Johnson

-           Volunteer day shirts, gloves, googles, medical supplies – Cintas Corporation

-           Window shades – Roll-A-Shade

-           Breakfast on volunteer day – Starbucks

-           Water softener – Primary – Culligan. Secondary – Kinetico

-           Warehouse in Orlando for material staging – National Distribution Service, Inc.

-           Develop logo for Daily Bread – Flora Creative

-           Financial donation - Don Turner (Darden)

Please contact me if I missed anyone. Again, thanks so much for your support. Feel free to contact me with any issues or questions at: jeff@rfmaonline.com or call me at (972) 805-0905, x-3.



Tags:  Daily Bread  equipment  remodels  RFMA Gives 2017  services 

PermalinkComments (0)
 

RFMA Gives 2017 Update

Posted By Jeff Dover, CRFP, RFMA, Thursday, June 16, 2016
Updated: Wednesday, June 15, 2016

Hello RFMA members,

I continue to be amazed and humbled by our membership's generosity for our RFMA Gives projects. A few weeks ago the potential project information was emailed and blogged out to our members and the response for donations was wonderful. A large number of items have already been assigned to various companies and members. Thank you to everyone that has volunteered their services, equipment, and time. There are still numerous projects left. Please review the updated potential projects below and let either myself or one of the project co-chairs know if you can help. Also, note the items already been chosen and assigned. If I missed your donation, please let me know.

MISCELLANEOUS DB NEEDS

Project Management

  • Volunteer project managers – looking for individuals who are local to the Orlando area who are able to volunteer their time to manage and oversee portions of the project (Jack McNertney, CRFP - Red Lobster, Doug Estes - Olive Garden, Michael Zografos - Longhorn, Debbie Nelson - Darden, Dave Masone - Red Lobster)

Grease Services Contractor

  • Provide maintenance for in-ground grease interceptor (Primary - SLM Facility Solutions Nationwide, Secondary - Liquid Environmental Solutions)

Industrial Supplier

  • Pallet Jack (Classic Installs, Inc.)

Restaurant Supplier

  • Disposable plates, cups, spoons, paper goods, etc.

Kitchen Equipment Repair

  • Service providers willing to provide repair service to hot and cold side equipment at no charge to the facility as needed with their current equipment

Hood Cleaning Company

  • Routine Hood Cleaning Program (Rainbow International Restoration)

Waste Services Company

  • Provide roll-off container(s) for project duration (Primary - RiverRoad Waste Solutions, Inc., Secondary - Westrock & Waste Management)

Restaurant or Equipment Supplier

  • Need new small wares for kitchen (Franklin Machine Products)
  • Folding style tables and chairs for dining room, patio tables/chairs for exterior
  • Shelving for kitchen/dry storage areas - Metro Style (VMC Facilities, LLC)
  • Shelving for new walk in cooler & freezer units - Metro Style (VMC Facilities, LLC)

DB BUILDING INTERIOR

Electrical Supplier, Electrical Contractor

  • Electrical panel upgrade (permit)

Janitorial Contractor

  • FOH Flooring- Strip and reseal VCT, replace black vinyl base

Flooring Supplier, Flooring Contractor

  • Replace flooring BOH service Areas (Quarry, Silikal or other) (Silikal America)

Electrical Supplier, Electrical Contractor

  • Upgrade interior FOH/BOH 2 x 4 ceiling troffers to LED troffers (Stones River Electric)

Fire Suppression Company

  • Upgrade Hood Fire Suppression System (Permit)

Carpentry, General Contractor

  • Replace FOH/BOH ceiling tiles & BOH Grid- BOH 2 x 4 Vinyl Face Gyp. FOH 2 x 4 non-directional all-purpose ceiling tile (Sapphire Construction)

Restaurant or Equipment Supplier, Plumber

  • Repair/replace three compartment sink

Restaurant or Equipment Supplier, Stainless Steel Fabricator, Plumber (gas), Electrical, Carpentry, General Contractor

  • Replace wooden pass thru with stainless steel shelving, replace existing chef's station using Stainless Steel Chef's station with hot/cold drawer under storage (Florida Stainless)

General Contractor, Carpenter

  • Provide and install FRP at BOH Food Prep & Cooking areas.

Restaurant or Equipment Supplier, Stainless Steel Fabricator, Electrical, Carpentry, General Contractor

  • BOH Equipment Upgrades, Propane Vulcan convection oven and stack kit (one oven already exists), Stainless steel work table, stainless steel shelving, propane cook-top w/ 4-6 burners and flat top combo, wall mount lettuce crisper

General Contractor, Designer

  • Redesign & rearrange kitchen for greater efficiencies (Ruby Tuesday, Inc.)

Plumbing Supplier, Plumbing Contractor

  • Replace storage tank style water heater with exterior mounted gas tankless unit (Water Heater Man, Inc.)

HVAC, Electrical

  • Relocate existing ice machine

General Contractor, Electrical

  • Create new “soup area” in kitchen (demo existing wall, shift layout, reconstruct replacement wall w/ GWB & FRP)

General Contractor, RFMA Volunteers

  • Remove upright 2-door cooler and 2-door freezer

General Contractor, Carpentry, Plumbing Contractor, Plumbing Supplier, Electrical Contractor, Electrical Supplier, Flooring Contractor, Flooring Supplier, Concrete

  • Remodel existing men’s restroom, creating two (2) single use unisex restrooms (Permits)

General Contractor, Plumbing, Electrical, Flooring

  • Remodel existing women’s restroom into office space and storage room (Permits)

Plumbing

  • Supply/install new combination drinking fountain and bottle filler

RFMA Volunteers, Paint Contractor, Paint Manufacturer

  • Paint interior (Volunteer Day Participants, Benjamin Moore, DMC Facility Services, U.S. Exterior Services, Paint Folks)

Restaurant or Equipment Supplier, Walkin Manufacturer, Electrician, HVAC

  • Supply/install new WIC (walk in cooler) (Chipotle Mexican Grill)
  • Supply/install new WIF (walk in freezer)
  • Supply refrigeration for new walk in cooler & freezer (Heatcraft)
  • Fabricate/install new walk in's

Restaurant or Equipment Supplier

  • Supply/install two (2) electric tilt skillets/ soup warmers (large capacity)

Restaurant or Equipment Supplier, RFMA Volunteers

  • Remodel existing dry storage room, add storage shelving

Masonry, General Contractor, Overhead Door Company, Concrete

  • Supply/install new Garage style, pull down exterior door to be used for food deliveries

General Contractor, Carpenter

  • Remodel existing offices, creating a quiet room for professional services meetings (Construct floor to ceiling stud walls and finish with GWB & FRP).

HVAC Supplier, HVAC Contractor

  • Replace existing t-stats with EMS (Primary - Entouch Controls, Secondary - 75F, Ektos, LLC, Powerhouse Dynamics)

Security Contractor, Security Supplier

  • Supply/install security/CCTV system (Tyco Integrated Security)

DB BUILDING EXTERIOR

RFMA Volunteers, Painting Contractor, Paint Manufacturer

  • Paint the exterior of the building (U.S. Exterior, Paint Folks, Volunteers)
  • Supply paint for exterior/interior (Benjamin Moore & DMC Facility Services)

General Contractor, Carpentry, Masonry, Store Front Glass Contractor

  • Saw-cut CMU wall at three locations, install prestressed lintels and sills, install store front window frame and glass system. Total of 3 ea. Windows of approx. 48" w x 36" h. (Permits)

General Contractor, Shade Sail Manufacturer

  • Provide and install shade sail(s) at exterior courtyard

General Contractor, Carpentry

  • Flush-cut to concrete slab and remove/dispose of existing steel pipe queue rail at front entry overhang area.

Electrical Contractor, Electrical Supplier

  • Replace Wall sconces with LED wall packs. Upgrade pole light head to LED (Pole light only - MX Sevices)

Plumbing Contractor, Plumbing Supplier

  • Provide and install mop sink & Faucet at exterior receiving door area

HVAC Supplier/Manufacturer, HVAC Contractor, Roofing, Electrical (Permits)

  • Replace three (3) a/c units. Two (2) 5-7 ton self-contained. One (1) 3-5 ton split system (Johnson Controls & Trane)
  • Install new a/c units (Performance Air)

Roofing Contractor, Roofing Materials Supplier

  • Replace entire roof, single ply needed (Royalty Roofing & Duro-Last Roofing, Inc.)

Sign Company

  • Supply/install new signage (Primary - Sign Manager, Secondary - MC Sign)

Door & Hardware Supplier, Door & Hardware Installer, General Contractor, Carpenter, RFMA Volunteers (paint)

  • Replace all exterior doors (5) (LockNet)
  • Install replacement doors

Fence Manufacturer, Fence Install Contractor, RFMA Volunteers (fence screen)

  • Powder coat Aluminum fencing with gates at front of building. Fence screen material as courtyard area.

Pavement Contractor, General Contractor, Concrete Placement Contractor

  • Repair/replace parking lot in specific areas to include open-trough drain gutter at buildings rear (Mad Jack's Facilities Resource)

Pavement Contractor, RFMA Volunteers

  • Paint parking stops

Landscape Contractor, Exterior Services Management Company, RFMA Volunteers (Mulch)

  • Landscape Upgrades, Tree Trimming, Mulch (Dentco)

General Contractor, Carpentry, Paver Supplier, Pavement Contractor, Lumber Supplier

  • Courtyard Dining Area - Site grading, sub-base placement, pavers, paver installation, construct PT wood bench at perimeter area (Pavers only - Versico Roofing)

ADMINISTRATIVE BUILDING

Roofing Materials Supplier, Roofing Contractor

  • Roof repairs. Possible replacement (Royalty Roofing)

HVAC Supplier/ Manufacturer, HVAC Contractor

  • Replace a/c unit (Johnson Controls & Trane)

Flooring Supplier, Flooring Contractor

  • Replace flooring/carpet throughout

RFMA Volunteers, Painting Contractor, Paint Manufacturer

  • Paint the exterior of the building to match the DB (U.S. Exterior & Paint Folks)

Other

  • Periodic replacement of a/c filters (Bonded Filters)
  • Periodic HVAC maintenance (AFM, Inc)
  • Equipment cleaning, powerwashing, general janitorial (Hoodz International & Superclean)
  • RFMA Gives videos and photos (DWM, Inc.)
  • Volunteer Day shirts, gloves, medical supplies, safety googles (Cintas Corporation)
  • Water Softener (Culligan)
  • Window shades (Roll-A-Shade)
  • Food Safety Training (Lars Johnson)
  • Breakfast on Volunteer Day (Starbucks Coffee Company)

A special thanks goes to our project co-chairs, as they are making thing happen on site. Following is their contact info:

-             Ron Wilhite: ron.wilhite@rfsrenovates.com. Office number: (352) 848-2588.

-             Mark Gomolla: mgomolla@redrobin.com. Office number: (804) 306-9782.

-             Kelly Otto: kotto@redrobin.com. Office number: (774) 281-0886

The RFMA Gives 2017 Volunteer Day is scheduled for Saturday, September 24th. In a few days, an official registration will be set up on our website. Stay tuned.

Feel free to contact me with any questions. We will be holding our initial conference donor/volunteer conference call on Tuesday, June 28th from 9:00 - 9:30 AM, CST providing updates on committed services, items still remaining, and potential target dates. If you would like to attend, please contact me at: jeff@rfmaonline.com or call me at (972) 805-0905, x-3.

Thanks again!!

Tags:  charitable donations  Daily Bread  RFMA Gives 2017 

PermalinkComments (0)
 
more Calendar

4/23/2019
Maximize Your Membership: CRFP Webinar

4/26/2019
RFMA-U Webinar: CO2 Safety Monitoring Requirements

5/2/2019
Restaurant Peer to Peer Call: Budgeting & Store Audit

5/8/2019
Franchisee Focus Peer to Peer Call: Ice Machines

5/16/2019
Member Meet-Up 2019: Nashville, TN

Association Management Software Powered by YourMembership  ::  Legal