This website uses cookies to store information on your computer. Some of these cookies are used for visitor analysis, others are essential to making our site function properly and improve the user experience. By using this site, you consent to the placement of these cookies. Click Accept to consent and dismiss this message or Deny to leave this website. Read our Privacy Statement for more.
RFMA Gives
Blog Home All Blogs

2020 RFMA Gives Project List

Posted By Jeff Dover, CRFP, RFMA, Wednesday, June 5, 2019
Updated: Wednesday, June 5, 2019

Hello RFMA members,

RFMA is pleased to announce our RFMA Gives 2020 site is Stout Street Foundation located near the Denver Airport in Commerce City, CO. This year’s Project Co-Chairs are Josh Rains, CRFP, with Romano’s Macaroni Grill, Peggy Fromholz from Red Robing Gourmet Burgers and Jennifer Thompson with Punch Bowl Social. Stout Street's mission is “to provide a supportive, therapeutic community for addicts and alcoholics to help them help themselves so they may return to society as recovering, productive, and responsible citizens. Feel free to visit their website at: www.stoutstreet.org/ to learn more. We are very excited and looking forward to another wonderful and rewarding charity event.

The following potential projects and item needs are listed below. Please review and let us know what you can provide for required equipment, labor, and/or financial donation. Signups are now being accepted for any of these projects.

Residents Building

  • Grease Services: Provide pumping/maintenance for in-ground grease trap for one (1) year
  • Kitchen Equipment Repair: Service providers willing to provide repair service to hot and cold side equipment at no charge to the facility as needed with their current equipment
  • Hood Cleaning: Routine Hood Cleaning Program for one (1) year
  • Waste Services: Provide roll-off container(s) for some projects
  • Shelving for storage rooms on the 4th floor- Metro Style
  • Painting: Paint entire exterior of building (6 stories)
  • Paint Sundries Supplier: Provide paint and sundries for building exterior and interior work for Volunteer Day
  • Landscaping: Provide materials for minor landscaping needs for Volunteer Day
  • Ceiling Tiles: Provide new ceiling tiles for 1st floor of building, mainly the hallways
  • Cabinetry: Supply & install new counter-tops for reception desk
  • Lighting: Supply 20-30 can light fixtures (LED) for existing dropped ceiling
  • Lighting: Supply 20-30, 2'x 4' LED fixtures to replace existing fluorescents
  • Flooring: Supply and install new vinyl flooring in laundry room on 1st floor (~300 sq. ft.)
  • Kitchen Equipment: New 4-6 ft. S/S tables
  • General Contractor: Remodel exiting restrooms (10) to include new walls, flooring, vanities, plumbing, lighting. Most are individual bathrooms.
  • Window Covering/Shades: Provide and install window shades for the residents rooms (70-75 required)
  • Bedding: New mattresses for residents
  • Lighting: Replace wall lights in residence rooms (70-75)
  • General Contractor, Electrician, Flooring: Remodel existing two (2) elevator interiors to include upgraded lighting, flooring, and wall coverings

Residents Building - Women's Rec Room

  • General Contractor: General remodel to include: new lighting, flooring, window coverings, lights & fixtures, remove ceiling slats, existing bar cabinetry, and floor riser to make all one level.
  • Window Supplier/Installer: Replace broken windows in solarium room

Residents Building - Men's Rec Room

  • Paint & Sundries: Supply paint & sundries for walls
  • Ceiling Supplier: Repair/replace exiting ceiling
  • Lighting: Replace exiting 2'x 4' ceiling light fixtures with LED

Residents Building - OT Cove

  • Flooring: Replace exiting carpeting
  • Ceiling Supplier: Replace ceiling
  • Lighting: Replace exiting 2'x 4' ceiling light fixtures with LED

Kitchen Equipment

  • Air curtain for back door
  • Counter top mixer
  • Counter top electric steamer
  • Landscaping: Planter for exterior windows
  • Demo Crew/Awning Vendor: Either remove canopy framing over back door or add awning on existing frame

Administration Building

  • Painting: Paint entire exterior of building, 4 stories
  • Paint Sundries Supplier: Provide paint and sundries for building exterior and interior work for Volunteer Day
  • Lighting: Supply/install replacement lights over the vanities in the restrooms (6 total)
  • Exterior Building Materials: Replace the exterior insulated panels where birds are nesting
  • Plumbing: Remodel small mop sinks to include sinks, walls (FRP), flooring, and plumbing fixtures for three (3) mop sinks
  • General Contractor, Electrician, Flooring: Remodel one (1) elevator interior to include upgraded lighting, flooring, and wall coverings

3rd Floor Admin/Gathering Room

  • Flooring: Remove carpet and replace with new flooring
  • Furniture: Need 20 new round and 15, 8 ft. rectangle tables
  • Equipment: New refrigerated salad and buffet style hot bars
  • Lighting: Upgrade existing 2'x 4' fluorescent fixtures to LED (approx. 100)
  • New ice machine & bin (smaller capacity)
  • HVAC Contractor: Replace one (1) Carrier Heat Pump system

Exterior Patio Area/Garden

  • Awning: Supply & install sail type awning system over 1/3 of patio
  • General Contractor: Install concrete bollards for sail type awning system
  • New exterior picnic tables
  • Landscape: Prep/landscape back lot garden area

Parking Lot

  • Concrete/Asphalt: Repair approximately 100 linear feet of pavement from drainage damage

Volunteer Day

  • Volunteer Day shirts, gloves, medical supplies, safety googles
  • Water: Supply water for approx. 150 volunteer

Also, please note the new policy for multiple donors for the same product and/or service:

  • Once the potential items and projects have been established and formally communicated to the membership, there will be a two (2) week time period for receiving initial donations of products and services.
  • If multiple companies within the same product category submit a request to donate a product or service, there will be a drawing or possibly a splitting of the product or service between the competing vendors.
  • The project managers have the right to make exceptions, such as if one product better meets the scope of work than the others, or if one offer exceeds the total commitment of the others such as including installation plus equipment.
  • If the same two companies submit to provide a product or service in consecutive years, the company that wasn’t chosen in the prior year will be selected for the subsequent year. If more than those two companies submit and there will be a drawing.
  • Any company that is not selected to donate their own product or service, is still invited and encouraged to donate funds to underwrite a different part of the project and participate in the volunteer work day.
  • Once the submission window has closed, all subsequent submissions will be taken on a first come first served basis.

Feel free to contact me to volunteer for any above items, other donations or with questions.

The volunteer day is Saturday, September 21st. More information on the activities will be forthcoming. Stay tuned and don’t forget to subscribe to the RFMA Gives Blog on our website to receive updates as they become available.

Thank you so much for your continued support!!

Dover and out.

 Attached Thumbnails:

Tags:  2020 RFMA Gives  donations  giving back  RFMA  Stout Street Foundation 

PermalinkComments (0)